10 working daysMonday to the Friday after next.
One surfaceA flow, not the whole product.
Fixed feeAgreed before day one.
What you leave with.
- The interface, and the front-end in the repo you already ship from.
- Components named the way that repo already names them.
- A one-page note of what we decided, and what we left out.
If the surface is already clear.
Tell us which one.
Answers
- How long is a sprint?
- Ten working days, Monday to the Friday after next.
- What does a sprint cover?
- One surface. A flow, not the whole product. Designed, and in the repo. Then it stops.
- When is the fee set?
- The fee is fixed before day one. It is not published on the site.
- What do you leave with?
- The interface, and the front-end in the repo you already ship from. Components named the way that repo already names them. A one-page note of what we decided, and what we left out.