Oberyon Start a sprint

Sprint

Two weeks on one surface.

Designed, and in the repo. Then we stop.

Start a sprint
10 working daysMonday to the Friday after next.
One surfaceA flow, not the whole product.
Fixed feeAgreed before day one.

What you leave with.

If the surface is already clear.

Tell us which one.

Start a sprint

Answers

How long is a sprint?
Ten working days, Monday to the Friday after next.
What does a sprint cover?
One surface. A flow, not the whole product. Designed, and in the repo. Then it stops.
When is the fee set?
The fee is fixed before day one. It is not published on the site.
What do you leave with?
The interface, and the front-end in the repo you already ship from. Components named the way that repo already names them. A one-page note of what we decided, and what we left out.

The other ways.