Retainer
A seat in the sprint, every week.
The same person, on the branch your team already ships.
Talk about a retainerMonth to monthEither side can stop at the end of a month.
WeeklyNamed on Monday, merged by Friday.
Same personThe repo does not meet a new hand.
One surface, or every surface.
If the sprint is already moving.
We can sit in it next month.
Answers
- How does a retainer end?
- Either side can stop at the end of a month.
- What is the weekly cadence?
- Named on Monday, merged by Friday. The same person, on the branch your team already ships.
- What is Lumen?
- 3,999 EUR a month. One product surface, from design to the front-end in the repo.
- What is Vertex?
- 7,999 EUR a month. Every surface, in one system. Prototype, UI, and the code that ships.